this post was submitted on 24 Aug 2024
107 points (100.0% liked)

Technology

37603 readers
537 users here now

A nice place to discuss rumors, happenings, innovations, and challenges in the technology sphere. We also welcome discussions on the intersections of technology and society. If it’s technological news or discussion of technology, it probably belongs here.

Remember the overriding ethos on Beehaw: Be(e) Nice. Each user you encounter here is a person, and should be treated with kindness (even if they’re wrong, or use a Linux distro you don’t like). Personal attacks will not be tolerated.

Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 2 years ago
MODERATORS
 

“These big companies think they can enter small villages like ours, take our land, and destroy it.”

  • Microsoft is building a data center in Mekaguda, a village in the southern Indian state of Telangana, which is expected to start operations by 2025. About 70% of the construction has been completed.
  • Last month, the state government intervened after Microsoft cited problems with the local village council.
  • A group of local residents has filed a petition against Microsoft, claiming encroachment and the dumping of industrial waste in a nearby body of water. The court hearing for the petition is pending.

Addition: Why are E-Waste Strategies in Need for Sustainable Data Centers?

E-waste in data centers encompasses a wide array of discarded IT equipment such as servers, power distribution units, and other electronic components that are no longer in use. Despite the rapid pace of technological upgrades, the alarming statistic from the UN forecasts that e-waste volumes could reach 74.7 metric tons globally by 2030.

all 14 comments
sorted by: hot top controversial new old
[–] [email protected] 34 points 3 weeks ago (2 children)

Not that I doubt the locals or anything - and like, fuck Microsoft - but what kind of industrial waste would a data center have?

From the article, it sounds like the facility is still under construction, so I imagine there might be construction waste, but that's not really my field and I don't know what that looks like. Runoff cement?

[–] [email protected] 16 points 3 weeks ago (1 children)

So construction waste is a subcategory of industrial waste. Typical industrial waste includes toxic materials like excess cement, fiberglass, bits of plastic from wires and cables. But once the data center is in place, most likely the waste will be e-waste in nature. Think heavy metals, copper, and yet more plastic. And the thing is... This is why they're putting this data center here. Disposing of this toxic waste will be cheaper because it's less regulated. The long term cost of high tech industries like this to neo-colonialized communities like this is the communities themselves. It doesn't matter to Microsoft they're making the water undrinkable. They don't have to live there.

And realize, too. Bill Gates' philanthropic missions aren't accidents. He may not run the show at Microsoft anymore but he still benefits greatly from their business. His philanthropic efforts aren't about making the lives of people who are exploited better. They're about maintaining that cheap form of labor just a little bit longer. And that may not be Bill Gates' actual intention, but the fact of the matter is he's a billionaire. He could make much larger changes in the world by not being a billionaire. He has power and influence to do things the rest of us can't, but instead of treating the illness he treats the symptoms. His actions sustain the system he benefits from

[–] [email protected] 5 points 3 weeks ago

Maybe a local construction company dumping stuff?

[–] [email protected] 13 points 3 weeks ago

Maybe the construction requires the clearing out of old buildings/material and they are not properly disposing of the old materials? I can totally see a shitty contractor doing this. Still Microsoft's responsibility.

[–] [email protected] 9 points 3 weeks ago (3 children)

What industrial waste? Hot air?

[–] [email protected] 14 points 3 weeks ago* (last edited 3 weeks ago)

Try reading the article. The factory hasn't opened yet. They're dumping the waste from construction in a lake.

[–] [email protected] 3 points 3 weeks ago

I'm thinking of a "used" chilled water after flushing the pipe system?
Unused, expired diesel fuel (wtf)?

[–] [email protected] 1 points 3 weeks ago (1 children)

Old shredded hard drives are also produced by data centers? But I guess these locals want to see some profit from their neighboring data center.

[–] [email protected] 3 points 3 weeks ago (1 children)

Shredded SSDs? It's a ceramic dust.

[–] [email protected] 3 points 3 weeks ago

By ceramic dust you mean it is not poisonous? Or are some rare earth materials / heavy metals in there that poison drinking water?